ABB EHDB130
1. Open the democase door.
2. Take out the mains cord from the case.
3. Plug in the mains cord*
4. Switch on the demo using the mains switch.
5. You can toggle control between the control panel and the IO-panel with the “Loc/Rem” –button on the control panel.
a. To change the operation macro, navigate to assistants with the “Func” – button and select “Application Marco”. Use the I/O-panel text strips to see default I/O-configurations.
Note! Option modules assistant is not supported from firmware revision AS7R7363 onwards.
6. Switch “Start Interlock” switch to “on” position to enable drive operation. See the switch location in “Lay-out of the I/O-panel” chapter in this manual.
3BSE008508R1
DI810 Digital Input 24V 16 ch
3BSE008510R1
DO810 Digital Output 24V 16 ch
3BSE008512R1
DI820 Digital Input 120V a.c. 8 ch
3BSE008514R1
DO820 Digital Output Relay 8 ch
3BSE008516R1
AI810 Analog Input 8 ch
3BSE008534R1
TB805 Bus Outlet
3BSE008536R1
TB806 Bus Inlet
3BSE008538R1
TB807 Modulebus terminator
3BSE008544R1
AI820 Analog Input 4 ch
3BSE008546R1
AO820 Analog Output 4 ch
3BSE008550R1
DI821 Digital Input 230V 8 ch
Add: Building F05, High-tech Software Park, Xiamen City, Fujian Province
Tel: 0592-5211302
Mobile: 17750019513 (WhatsApp)
Email: yy4291644@gmail.com
ivy@kongjiangauto.com
Website: https://www.abb-sis.com